Logistics

[Translate to Englisch:]
[Translate to Englisch:]

The logistics of the future

We are taking a decisive step towards the future growth: Our innovative central warehouse in Alsfeld, Hesse will soon be a reality – with 68,000 m² of warehouse space, a large number of incoming and outgoing goods ramps, and state-of-the-art intralogistics technology. In addition to a highly automated small parts warehouse as the logistical centrepiece, there will also be a manual pallet warehouse and a large block warehouse for the efficient handling of our heterogeneous range of articles. In addition, driverless transport systems will be introduced for transport between functional areas, automatic carton erectors for supplying the packing stations and a modern IT system (warehouse management system combined with material flow control) for controlling the information and material flows of the warehouse and the automation technology. The creation of this new, high-performance, flexible and optimised central warehouse location will further underpin the status of logistics as a core competence at NORDWEST. This pioneering project aims to strengthen your position in your increasingly competitive environment.

The issue of sustainability is also of key importance to us in the planning of our new central warehouse. The plans for the new central warehouse in Alsfeld include:  

  • Heat generation: no gas connection and use of heat pumps
  • Large-scale photovoltaic system on the roof to supply our own electricity and feed it into the public grid
  • High-quality insulation for reduced energy requirements  
  • Use of intelligent conveyor technology to reduce energy requirements
  • Measures to reduce carbon emissions, such as presence detectors and intelligent LED lighting
  • Flower strips, insect hotels, species protection houses on the grounds and extensive roof greening
  • Roof greening
  • Comprehensive rainwater retention concept

Experience the construction site live from different perspectives

A construction project on the scale of our new central warehouse in Alsfeld is an exciting endeavour. That's why we have set up construction site cameras so that you can follow the progress of our construction work on a daily basis. View the construction site from different perspectives and angles - whether from a bird's eye view or up close - and experience the creation of our central warehouse step by step. Check this page regularly for exciting insights into the construction of the central warehouse!

Project presentation

Further information on the new NORDWEST logistics centre project in Alsfeld

Your contact

Bastian Wolfgarten Head of Division Logistics at NORDWEST Handel AG

Bastian Wolfgarten

Head of Division Logistics

Moritz Wernecke, Teamleiter Projektmanagement Logistik

Moritz Wernecke

Team Manager Project Management Logistics

Robert Stoschek, Bereichsleiter Lagermanagement

Robert Stoschek

Business Unit Manager Warehouse Management

We are always here for you! 

You can reach us here: